West London · Since 2010

Build the space
your house is missing.

A family building firm on Bilton Road in Perivale. The person who surveys your house is the person who runs your build, from the first tape measure through to the building control certificate.
15+
Years building across West London
10-16
Weeks on site, typical rear extension
One
Point of contact, survey to handover
architecture and planning
Planning checked before you spend
We confirm your permitted development position at survey stage
Extension cost calculator

See what it costs, and whether you need planning

Six questions, about two minutes. You get a cost range built from London build rates for 2026, and a clear read on whether your extension falls under permitted development.
Step 1: Extension type 1 of 6

What kind of extension are you planning?

The shape decides both the build rate and whether you need planning permission.

What kind of property is it?

This sets your permitted development allowance and whether party wall notices are needed.

How far out will it go?

Measured from the existing rear wall. This is the number that decides your planning route.

3.0metres deepPermitted development
1m3m8m

Not sure yet? Leave it at 3m, the standard permitted development limit.

Roughly when was the house built?
Older ground and shallower foundations carry more unknowns.

Size and specification

Roughly how much floor area it adds, and the level of finish you are picturing.

25square metresTypical
8 sqm30 sqm80 sqm

Anything you want included?

Tick what you would like in the figure. You can change all of this at survey stage.

Where shall we send it?

Your estimate appears on screen straight away. We confirm it in writing after a free survey, with no deposit and no obligation.

Used only to discuss your extension. We never pass your details to third parties.

Thank you, that is with our team

We will call within one working day to arrange your free survey.

Before you start

Three things decide what you can build

Most people begin with kitchen photographs. It is more useful to begin with your plot, because these three factors set the shape of the project before design is even discussed.
01

How far you can go back

Depth from the existing rear wall is the number that decides your planning route, and it is the first thing we measure.
Up to 3m: Permitted development on a terraced or semi-detached house.
Up to 4m: The same allowance on a detached house.
3m to 6m: Prior approval under the Larger Home Extension Scheme, with a neighbour consultation.
Conservation areas and flats sit outside all of this and need a full application. We check your specific address before any money goes on drawings.
02

What is holding the house up

Opening the back of a house means taking out load bearing structure and putting steel in its place.
Steel beams: Sized by a structural engineer, then checked on site before anything is closed up.
Foundations: Depth depends on ground conditions and nearby trees. Clay soil in West London often means deeper digs.
The party wall: On a terrace or semi you must serve notice two months before work starts.
This is where surprises live on a badly run job. We get the engineer in early so the numbers are known before you commit.
03

Drains, boundaries and light

The things that quietly reshape a design once someone actually looks at the site.
Drain runs: Building over a public sewer needs a build over agreement from Thames Water.
Boundary lines: Side extensions are limited to half the width of the original house under permitted development.
Neighbour windows: Right to light and overlooking can change the roof design on a tight London plot.
None of these stop a project. They just need finding at survey rather than halfway through the build.
Your options

Four kinds of extension, explained properly

The names describe what happens to the footprint of the house. Knowing the difference makes every conversation with a builder more productive.

Single storey rear

The most common in London
The back of the house comes out into the garden, usually to create an open plan kitchen and dining space. Within 3m on a terrace or semi it normally falls under permitted development, and up to 6m under the larger home extension scheme with a neighbour consultation. The simplest route to a genuinely different ground floor.
Best suited to
Terraced and semi-detached houses wanting a kitchen diner across the full width.

Side return

Fills the alley beside the house
That narrow strip of unused land beside a Victorian terrace becomes internal floor space. It rarely adds a huge area, but it transforms a dark galley kitchen into a wide, bright room. Often combined with a modest rear extension. Limited to half the width of the original house under permitted development.
Best suited to
Victorian and Edwardian terraces with a side alley and a cramped kitchen.

Wraparound

Rear and side combined
The side return and the rear extension built as one, wrapping around the back corner of the house. It gives the largest ground floor gain of any single storey option and usually allows a proper utility or downstairs WC alongside the kitchen. Almost always needs full planning permission.
Best suited to
Period terraces where one room is not enough and the budget allows for it.

Double storey

Adds a room upstairs too
Extending across two floors gives you a bedroom or bathroom above the new ground floor space. Per square metre it is cheaper than building out once, because you only dig one set of foundations. Permitted development limits are tight at 3m depth with a 7m rear boundary gap, so most London plots need planning.
Best suited to
Families needing both living space and an extra bedroom without moving.

Not sure which shape fits?

Run the calculator at the top of this page, or ring us and we will talk it through in five minutes.
The most common brief

Kitchen extensions in West London

Most of the extensions we build end up as a kitchen. It is the room that changes how a house actually works, and it is where the money goes furthest. Below are the three briefs we are asked for most often.

Open plan kitchen diner

The classic rear extension brief. The back wall comes out, the old kitchen and dining room become one space, and the garden becomes part of the room rather than something you look at through a door.

Widening a galley kitchen

On a Victorian or Edwardian terrace the side return turns a narrow, dark galley into a proper working kitchen. It adds less floor area than a rear extension but often makes a bigger difference to daily life.

Kitchen with garden access

Where the priority is the connection to outside rather than raw floor area. Level thresholds, a wide glazed opening and a terrace that reads as a continuation of the floor inside.
What people actually pay

Typical extension costs in West London

Real ranges for a standard specification on a terraced or semi-detached house, including architectural drawings, structural calculations, building control, party wall notices, contingency and VAT. Not a build-only rate with the fees left off.
Size
Type
Typical range
What that usually buys
15 m²
Small rear
£57,500 to £73,000
A dining area, utility and downstairs WC
20 m²
Rear
£74,000 to £94,000
A kitchen diner across the back of the house
25 m²
Rear
£90,500 to £115,000
Kitchen diner with an island and seating
30 m²
Rear or side return
£107,000 to £136,000
Open plan kitchen, dining and living
40 m²
Wraparound
£138,000 to £198,500
Kitchen, dining, utility and a WC
Why our figures look higher than some quotes
A build-only rate with the professional fees, scaffolding and making good stripped out will always read cheaper. It is not a cheaper project, it is a shorter list. Ask any builder what their number excludes before you compare it with ours.
Permissions

Planning, building regulations and party walls

Three separate things, regularly confused with one another. Knowing which applies to you removes most of the worry from the process.
Most single storey rear extensions on houses do not need planning permission. They fall under permitted development, a national allowance to build without applying to the council.
Always get a lawful development certificateIt is formal confirmation from the council that the work was permitted. A buyer’s solicitor will ask for it when you sell, and it costs a fraction of a full application.
Between 3m and 6m on a terrace or semi, and up to 8m on a detached house, you can build under the Larger Home Extension Scheme. It is not a full planning application, but it is not automatic either.
Your neighbours get 21 daysThe council writes to the adjoining owners. If none of them object within 21 days, the work goes ahead. If someone does object, the council decides on the impact rather than refusing automatically.
Whether or not you need planning permission, every extension needs building regulations approval. Planning is about how the building looks and affects the neighbourhood. Building control is about whether it is safe and warm. An inspector visits at stages and issues a completion certificate at the end.
Foundations
Depth is set by ground conditions and nearby trees. Clay soil and mature trees in West London often mean digging deeper than people expect.
Structure
Steel beams carry the load where the old rear wall used to be. Sized by a structural engineer and checked on site before anything is boarded over.
Drainage
If the extension crosses a public sewer you need a build over agreement from Thames Water. Better found at survey than when the digger arrives.
Insulation and glazing
Walls, floor and roof must meet current thermal standards, and large glazed areas are limited as a proportion of floor area.
Ventilation and heating
Extract ventilation in kitchens, and the existing boiler checked against the larger heat load it now has to serve.
Fire safety
Escape routes and alarm coverage are reassessed once the ground floor layout changes, particularly on open plan designs.
If you live in a terraced or semi-detached house and the work involves cutting into the shared wall, building off it, or excavating within 3m of it, you must serve notice under the Party Wall etc. Act 1996.
Notice must be served two months before work starts. Neighbours can consent in writing at no cost. If they dissent, surveyors are appointed to agree a schedule of condition before anything begins.
Start this earlyIt is routine, but leaving it late is the most common cause of delay on a terraced extension. We serve the notices for you as part of the approvals stage.
How it runs

From first survey to final certificate

You will always know which stage you are in and who to call. It is the same number throughout.
01

Free survey

We measure the plot, check the drains and boundaries, and tell you what your permitted development position actually is.
02

Drawings

Architectural drawings and structural calculations. You see the space in plan before anything is committed.
03

Approvals

Lawful development certificate, prior approval or full planning. Building control, and party wall notices to your neighbours.
04

Build

Foundations, steels, shell, roof, then first fix, plaster, glazing and finishes. Site swept daily and sheeted overnight.
05

Handover

Final inspection, snagging cleared, then your completion certificate, electrical certificate and workmanship guarantee.
No surprises

What is in the price, and what is not

The single biggest cause of a project going wrong is a quote that quietly leaves things out. Ours states both sides. If a builder will not put this in writing before you sign, that tells you something.

Included as standard

Not included unless we agree it

On provisional sums
Where something genuinely cannot be priced until the ground is open, such as foundation depth, we tell you the assumption we have priced against and what the cost would be if it changes. You will never find out about it for the first time in an invoice.
Peace of mind

Why homeowners trust us with a build this size

An extension is one of the largest purchases most people make after the house itself, from a firm they have usually never met. These are the things we put in writing before any money changes hands.

A fixed price, in writing

You get a written specification and a fixed price before we start, not a day rate and an estimate. The number we survey to is the number you pay, unless you change the brief.

No deposit to get a price

The survey, the measurements and the written quote cost you nothing and commit you to nothing. We will tell you if we think the project does not stack up on your house.

One point of contact

The person who surveys your property is the person who runs your build. You are not handed to a call centre, and you do not coordinate an architect, an engineer and a builder yourself.

Certificates at handover

You finish with a building control completion certificate, electrical certification and, where one applies, the lawful development certificate. The paperwork a buyer’s solicitor will ask for.

Fifteen years, one area

A family firm on Bilton Road in Perivale, building in West London since 2010. We stay local because it is the only way to get back to a site quickly when something needs us.

Neighbours handled properly

Party wall notices served on time, a schedule of condition agreed, and the site kept clean. Most of our work comes from streets where we have already built something.
Customers

What West London homeowners say

Feedback collected directly from clients after their projects were completed. Several of these relate to loft conversions rather than extensions, but the team and the way we work are the same.
5.0
Based on 13 customer reviews
Leave a review on Google
Where we work

West and North West London only

We deliberately stay local. It is how we reach a site quickly when something needs attention.
Common questions

Extension questions answered

A single storey rear extension in London runs roughly £2,500 to £4,500 per square metre of new floor area. For a typical 20 to 30 square metre rear extension that puts most projects between £75,000 and £120,000 including professional fees and VAT.

The calculator on this page gives you a range for your specific size, type and specification in about two minutes.

Often not. A single storey rear extension up to 3m on a terraced or semi-detached house, or 4m on a detached house, normally falls under permitted development. Between 3m and 6m you can use the Larger Home Extension Scheme, which means a neighbour consultation rather than a full application.

Flats, listed buildings, conservation areas and most wraparound or double storey extensions need full planning permission.

A straightforward single storey rear extension is usually 10 to 16 weeks on site. Before that, allow four to ten weeks for drawings, structural calculations and approvals.

Party wall notices need two months, so on a terraced house that often sets the start date rather than the build programme.

Yes, and most people do. The kitchen is the difficult part rather than the noise, so we help you plan a temporary kitchen before we start.

The disruptive stages are the foundations and the day the rear wall comes out. We tell you in advance which days those will be.

If you live in a terraced or semi-detached house and the work touches the shared wall, or you excavate within three metres of it, you must serve notice two months before starting.

Most neighbours simply consent in writing at no cost. If they dissent, surveyors agree a schedule of condition first. We handle the notices as part of the approvals stage.

In West London, usually. An extension that creates a proper open plan kitchen and dining space is what buyers in this area look for, and building outwards compares well with moving once stamp duty, agents’ fees and legal costs are counted.

It is not guaranteed and depends on your street and its ceiling price. If we think the numbers do not work on your house, we will tell you.

A side return fills the narrow alley beside the house, usually widening a galley kitchen. A wraparound does the side return and a rear extension as one, wrapping round the back corner.

The wraparound gives more space but almost always needs full planning permission, where a modest side return often does not.

Yes. Architectural drawings, structural engineer’s calculations, the lawful development certificate or planning application, building control and the party wall notices are all handled by us.

You get one point of contact throughout rather than coordinating an architect, an engineer and a builder yourself.

Start with a survey and an honest answer

We measure the plot, check the drains and boundaries, and tell you exactly what you can build and what it will cost. No charge, no deposit and no obligation, including if the answer is that the project does not stack up.